its getting there meilack
my Dad and I have had a busy few days all the paint work has been repaired after a brake fluid leak from the servo

and my manifold has been finished, throttle bodies painted up and all the parts to turn the engine over have arrived i am just short of two hose connectors which I should be able to pick up local and hopefully get the engine running monday evening
Tomorrows job is to re bleed the brakes and fit the inlet and ITB's and finish the wiring in the engine bay and fit the last few hoses
just a few pictures

brakes rebuilt with new seals and a fresh coat of paint

new positive battery terminal to allow the amp to be wired in etc....

throttle bodies painted up and inside polished



another set of gsxr throttle bodies, purchased for the injectors 270cc and the loom plugs and a new TPS

throttle bodies put together with custom fuel rail and throttle cable bracket to fit the standard ka throttle cable

new custom made inlet manifold (aluminium) to allow the throttle bodies to fit in the engine bay

back of the manifold showing the vac line for the crank case breather (in line filter will be used) paint will be removed before fitting
hope you like will update again tomorrow night
_________________

1.8 zetec converted ka 0-60 in 7.81 sec